Apply First, Claim Later: Steps to Claim the UAE R&D Tax Credit

Apply First, Claim Later: Steps to Claim the UAE R&D Tax Credit

AURIFER

UAE tax insight · 13 November 2026

Apply First, Claim Later: Steps to Claim the UAE R&D Tax Credit

From TAWWER pre-approval to the Corporate Tax return, and how the scheme compares with the UK, Canada and Singapore.

  1. 26 February 2027Apply in TAWWER
  2. ERDC decisionNo review period published
  3. 30 June 2027Expenditure Confirmation
  4. 30 September 2027Corporate Tax return and claim

Illustrated for a 31 December 2026 year end.

No pre-approval, no claim.

Every R&D project needs approval from the Emirates Research and Development Council (ERDC) for each tax period claimed. The approval comes before the Corporate Tax return, not with it.1

AED 2mMaximum credit per period for an entity or Tax Group, on up to AED 5m of spend2
14+Average R&D staff needed for the 50% band (2 for 15%, 6 for 35%)2
40Business days after period end to apply, for periods ending by 31 December 20261

Part one

The journey

The credit is governed by Cabinet Decision No. 215 of 2025 (CD 215/2025) and Ministerial Decision No. 24 of 2026 (MD 24/2026). Applications run through TAWWER, the ERDC’s platform.

  1. The gateway

    Pre-approval is required for each R&D project and each tax period claimed (CD 215/2025, Article 3(1)(b), and MD 24/2026, Article 4(1)).

    ERDC

    Do the activities qualify, and is the spend eligible

    Federal Tax Authority

    Deductibility, arm’s length principle and the credit calculation

  2. Timing

    Tax period endsApply by
    On or before 31 December 202640 business days after period end, which is 26 February 2027 for a calendar-year taxpayer
    After 31 December 2026The last day of the period, for example 31 December 2027

    The process is set by ERDC Decision No. 01 of 2026, whose English text is an unofficial translation. The 26 February date assumes weekends and federal holidays are excluded and no further holiday is declared.

  3. Access

    The company applies (the Qualifying Entity, Tax Group parent or Domestic Designated Filing Entity, under MD 24/2026, Articles 13(9) and 14(8)), through an authorised user.

    1. UAE PASSVerified account
    2. Company check15-digit tax registration number
    3. FTA signatoryApproves organisation access
  4. The application

    One application per project, per tax period. Each activity must meet all five conditions (MD 24/2026, Article 3(1)), judged by the OECD Frascati Manual.

    • Novel
    • Creative
    • Uncertain
    • Systematic
    • Transferable or reproducible

    Only R&D done in the UAE counts, and the claimant must bear the cost and share in the returns (MD 24/2026, Article 3(3), and CD 215/2025, Article 3(1)(c) and (d)). ERDC guidance says uncertainty is usually the decisive condition.

  5. After submission

    Request for InformationERDC needs more.Reply within 20 business days or it is rejected
    Pre-approvedProof of Pre-Approval is issued, possibly for part of the project.Move to the Expenditure Confirmation
    RejectedERDC must state its grounds.Reconsideration within 30 business days, or a new application within the original deadline

    Notices count as received when posted in TAWWER, and the Council has no deadline to decide.

  6. After approval

    30 June 2027 for a calendar-year 2026 taxpayer

    • Confirm actual activities, staff and spend in TAWWER within six months of period end.
    • A late or failed confirmation lapses the pre-approval, and the compliance check cannot be challenged through reconsideration.
    • Each project needs at least AED 500,000 of qualifying spend before the 30% staff uplift (CD 215/2025, Article 5(3)(b)).
  7. The claim

    30 September 2027 for a calendar-year 2026 taxpayer

    Claimed from the FTA in the Corporate Tax return, due nine months after period end (Federal Decree-Law No. 47 of 2022, Article 53(1)), with:

    • Proof of pre-approval
    • Senior management declaration
    • Expenditure breakdown
    • Audited financial statements

    The credit is non-refundable in Phase 1 (MD 24/2026, Article 2(2)).

Self-check

Which band could you reach?

Both tests apply to each band. Enter your figures to see where you land.

AED 1,500,000
AED 500,000
15%Band 1. First AED 1m of spend, 2 or more staff
35%Band 2. AED 1m to 2m, 6 or more staff
50%Band 3. AED 2m to 5m, 14 or more staff
AED 0
Staff costs
AED 0
30% uplift on staff costs
+ AED 0
Other qualifying costs
+ AED 0
Qualifying expenditure
AED 0
Spend before the uplift (AED 500,000 minimum)
AED 0

* The 30% uplift applies to staff costs only (MD 24/2026, Article 8(3)), so AED 1m of staff costs counts as AED 1.3m. Other costs are consumables, UAE subcontracting and cost contribution payments. The AED 500,000 project minimum is tested on spend before the uplift.

Illustration only. MD 24/2026, Article 2(7), limits the credit to the highest band for which both the expenditure and staffing tests are met, so expenditure above that band’s ceiling earns no credit. Spend below AED 500,000 before the uplift earns no credit here (CD 215/2025, Article 5(3)(b)). It ignores eligibility and the tax available to absorb the credit.2

Part two

How the UAE compares

Benchmarked against the UK, Canada and Singapore.3, 4, 5

A high top rate with a hard stop

The 50% band covers AED 2m to AED 5m of spend. Above that the credit adds nothing, capped at AED 2m per entity or Tax Group.

Rate tied to headcount

The bands need 2, 6 and 14 average R&D staff. None of the benchmarks does this.

No cash in Phase 1

The UK, Canada and Singapore all pay some cash, subject to caps and conditions.

Approval comes first

Only the UAE requires approval before the claim, per project and period.

How the UAE credit builds up

UAE R&D tax credit by qualifying expenditure Cumulative credit rises to AED 150,000 at AED 1 million of spend, AED 500,000 at AED 2 million and AED 2 million at AED 5 million, then stays flat. 00.51.01.52.0 0123456 AED 150kAED 500kAED 2.0m cap 15%2+ staff 35%6+ staff 50%14+ staff No creditabove AED 5m Qualifying R&D expenditure per period (AED million) Credit (AED million)
Assumes the staffing for each band is met. If a test is missed, the credit is limited to the highest band where both tests are met (MD 24/2026, Article 2(7)).

What each scheme returns on the same spend

Benefit as a percentage of qualifying spend, for a profitable company that meets each scheme’s own conditions.

Benefit as a percentage of qualifying R&D spend at two programme sizes At about AED 1 million of spend the UAE returns 15%, the UK 20%, Canada 35% and Singapore 51%. At about AED 5 million the UAE returns 40%, the UK 20%, Canada 35% and Singapore 31%. About AED 1m of spend (US$270,000)About AED 5m (US$1.36m) 0%20%40%60% UAE2+ staff, then 14+ 15% 40% UKtaxable, about 15 net 20% 20% Canadaqualifying CCPC 35% 35% Singaporetax saved at 17% 51% 31%
How to read it. Compare the two bars within a country for the effect of size, and across countries at the same size. The UK credit is taxable, so about 15% after tax. Singapore is tax saved at 17%, Aurifer’s own arithmetic. Canada’s 35% is for qualifying CCPCs and may be lower after tax. Currencies are converted at rough rates.
Side by sideUAE against three benchmarks, as at 13 November 2026
JurisdictionForm of reliefCeilingCash if no tax
UAECredit, 15% / 35% / 50%AED 2m credit (AED 5m of spend)Not in Phase 1
UKTaxable credit, 20%. ERIS for loss-making intensive SMEsNo cap on the credit. Cash capped at £20,000 plus 300% of PAYE and NICLoss-makers, within the cap
CanadaCredit, 35% refundable for qualifying CCPCs and public corporations, then 15%C$2.1m refundable (C$6m of spend), phased out above C$15m of taxable capitalQualifying CCPCs, within the limit
SingaporeEnhanced deduction, 400% then 250%S$400,000 at 400% per yearOptional, up to S$20,000 in total, needs 3 local employees

Using the credit. At the 9% rate, absorbing AED 2m in one year needs about AED 22.6m of taxable income. Unused credit carries forward if ownership tests are met (MD 24/2026, Article 5) and can offset Top-up Tax. The Ministry of Finance calls this Phase 1 and has said refundability may be considered later.2

Planning your 2026 claim

  • Which projects meet the five conditions
  • Who holds TAWWER access
  • How the credit sits against your Corporate Tax and Top-up Tax

Nirav leads Aurifer’s UAE and Qatar practice and advises on complex cross-border structuring across the GCC, including UAE Corporate Tax, GCC VAT, Pillar Two and tax litigation.

nirav@aurifer.tax

This article is for general information only. It reflects the law and practice as at 13 November 2026, is not tax or legal advice on any specific arrangement, and may not be relied upon for penalty protection.

Team AURIFER

References

  1. ERDC Decision No. 01 of 2026, as summarised by Averise Advisors (6 November 2026), Deloitte and RDvault. The text was not reviewed directly.
  2. Cabinet Decision No. 215 of 2025 (uaelegislation.gov.ae) and Ministerial Decision No. 24 of 2026 (mof.gov.ae). Phase 1 commentary from PwC and KPMG.
  3. UK merged scheme and ERIS. GOV.UK for the PAYE cap, with practitioner guides.
  4. Canada SR&ED and Bill C-15 (Royal Assent 26 March 2026), via BDO, KPMG and CRA wording reproduced by DT Max.
  5. Singapore Enterprise Innovation Scheme, IRAS e-Tax Guide (30 September 2025).