AURIFER
UAE tax insight · 13 November 2026
Apply First, Claim Later: Steps to Claim the UAE R&D Tax Credit
From TAWWER pre-approval to the Corporate Tax return, and how the scheme compares with the UK, Canada and Singapore.
- 126 February 2027Apply in TAWWER
- 2ERDC decisionNo review period published
- 330 June 2027Expenditure Confirmation
- 430 September 2027Corporate Tax return and claim
Illustrated for a 31 December 2026 year end.
No pre-approval, no claim.
Every R&D project needs approval from the Emirates Research and Development Council (ERDC) for each tax period claimed. The approval comes before the Corporate Tax return, not with it.1
Part one
The journey
The credit is governed by Cabinet Decision No. 215 of 2025 (CD 215/2025) and Ministerial Decision No. 24 of 2026 (MD 24/2026). Applications run through TAWWER, the ERDC’s platform.
-
The gateway
Pre-approval is required for each R&D project and each tax period claimed (CD 215/2025, Article 3(1)(b), and MD 24/2026, Article 4(1)).
ERDC
Do the activities qualify, and is the spend eligible
Federal Tax Authority
Deductibility, arm’s length principle and the credit calculation
-
Timing
Tax period ends Apply by On or before 31 December 2026 40 business days after period end, which is 26 February 2027 for a calendar-year taxpayer After 31 December 2026 The last day of the period, for example 31 December 2027 The process is set by ERDC Decision No. 01 of 2026, whose English text is an unofficial translation. The 26 February date assumes weekends and federal holidays are excluded and no further holiday is declared.
-
Access
The company applies (the Qualifying Entity, Tax Group parent or Domestic Designated Filing Entity, under MD 24/2026, Articles 13(9) and 14(8)), through an authorised user.
- UAE PASSVerified account
- Company check15-digit tax registration number
- FTA signatoryApproves organisation access
-
The application
One application per project, per tax period. Each activity must meet all five conditions (MD 24/2026, Article 3(1)), judged by the OECD Frascati Manual.
- Novel
- Creative
- Uncertain
- Systematic
- Transferable or reproducible
Only R&D done in the UAE counts, and the claimant must bear the cost and share in the returns (MD 24/2026, Article 3(3), and CD 215/2025, Article 3(1)(c) and (d)). ERDC guidance says uncertainty is usually the decisive condition.
-
After submission
Request for InformationERDC needs more.Reply within 20 business days or it is rejectedPre-approvedProof of Pre-Approval is issued, possibly for part of the project.Move to the Expenditure ConfirmationRejectedERDC must state its grounds.Reconsideration within 30 business days, or a new application within the original deadlineNotices count as received when posted in TAWWER, and the Council has no deadline to decide.
-
After approval
30 June 2027 for a calendar-year 2026 taxpayer
- Confirm actual activities, staff and spend in TAWWER within six months of period end.
- A late or failed confirmation lapses the pre-approval, and the compliance check cannot be challenged through reconsideration.
- Each project needs at least AED 500,000 of qualifying spend before the 30% staff uplift (CD 215/2025, Article 5(3)(b)).
-
The claim
30 September 2027 for a calendar-year 2026 taxpayer
Claimed from the FTA in the Corporate Tax return, due nine months after period end (Federal Decree-Law No. 47 of 2022, Article 53(1)), with:
- Proof of pre-approval
- Senior management declaration
- Expenditure breakdown
- Audited financial statements
The credit is non-refundable in Phase 1 (MD 24/2026, Article 2(2)).
Self-check
Which band could you reach?
Both tests apply to each band. Enter your figures to see where you land.
The printed copy shows 8 average R&D staff, AED 1,500,000 of staff costs and AED 500,000 of other costs. Use the HTML version for your own figures.
- Staff costs
- AED 0
- 30% uplift on staff costs
- + AED 0
- Other qualifying costs
- + AED 0
- Qualifying expenditure
- AED 0
- Spend before the uplift (AED 500,000 minimum)
- AED 0
* The 30% uplift applies to staff costs only (MD 24/2026, Article 8(3)), so AED 1m of staff costs counts as AED 1.3m. Other costs are consumables, UAE subcontracting and cost contribution payments. The AED 500,000 project minimum is tested on spend before the uplift.
Illustration only. MD 24/2026, Article 2(7), limits the credit to the highest band for which both the expenditure and staffing tests are met, so expenditure above that band’s ceiling earns no credit. Spend below AED 500,000 before the uplift earns no credit here (CD 215/2025, Article 5(3)(b)). It ignores eligibility and the tax available to absorb the credit.2
A high top rate with a hard stop
The 50% band covers AED 2m to AED 5m of spend. Above that the credit adds nothing, capped at AED 2m per entity or Tax Group.
Rate tied to headcount
The bands need 2, 6 and 14 average R&D staff. None of the benchmarks does this.
No cash in Phase 1
The UK, Canada and Singapore all pay some cash, subject to caps and conditions.
Approval comes first
Only the UAE requires approval before the claim, per project and period.
How the UAE credit builds up
What each scheme returns on the same spend
Benefit as a percentage of qualifying spend, for a profitable company that meets each scheme’s own conditions.
| Jurisdiction | Form of relief | Ceiling | Cash if no tax |
|---|---|---|---|
| UAE | Credit, 15% / 35% / 50% | AED 2m credit (AED 5m of spend) | Not in Phase 1 |
| UK | Taxable credit, 20%. ERIS for loss-making intensive SMEs | No cap on the credit. Cash capped at £20,000 plus 300% of PAYE and NIC | Loss-makers, within the cap |
| Canada | Credit, 35% refundable for qualifying CCPCs and public corporations, then 15% | C$2.1m refundable (C$6m of spend), phased out above C$15m of taxable capital | Qualifying CCPCs, within the limit |
| Singapore | Enhanced deduction, 400% then 250% | S$400,000 at 400% per year | Optional, up to S$20,000 in total, needs 3 local employees |
Using the credit. At the 9% rate, absorbing AED 2m in one year needs about AED 22.6m of taxable income. Unused credit carries forward if ownership tests are met (MD 24/2026, Article 5) and can offset Top-up Tax. The Ministry of Finance calls this Phase 1 and has said refundability may be considered later.2
Planning your 2026 claim
- Which projects meet the five conditions
- Who holds TAWWER access
- How the credit sits against your Corporate Tax and Top-up Tax
Nirav leads Aurifer’s UAE and Qatar practice and advises on complex cross-border structuring across the GCC, including UAE Corporate Tax, GCC VAT, Pillar Two and tax litigation.
This article is for general information only. It reflects the law and practice as at 13 November 2026, is not tax or legal advice on any specific arrangement, and may not be relied upon for penalty protection.
Team AURIFER
References
- ERDC Decision No. 01 of 2026, as summarised by Averise Advisors (6 November 2026), Deloitte and RDvault. The text was not reviewed directly.
- Cabinet Decision No. 215 of 2025 (uaelegislation.gov.ae) and Ministerial Decision No. 24 of 2026 (mof.gov.ae). Phase 1 commentary from PwC and KPMG.
- UK merged scheme and ERIS. GOV.UK for the PAYE cap, with practitioner guides.
- Canada SR&ED and Bill C-15 (Royal Assent 26 March 2026), via BDO, KPMG and CRA wording reproduced by DT Max.
- Singapore Enterprise Innovation Scheme, IRAS e-Tax Guide (30 September 2025).